Assignment NO 12(DD DATA COLLECTION)

Objective:

Find out the way for good airflow and air should be equally

Procedure:

The next batch started on 4th of January 2019. The procedure followed was;

  1. Take 3.5 kg sawdust.
  2. Mix 11 liter water in sawdust.
  3. Leave the mixture for half an hour.
  4. After that do the weight of it.
  5. Take 10 gm sample for LOD.
  6. Evenly distribute wet sawdust on each plate. As follows, Plate One- 1 kg, Plate Two- 1.5 kg, Plate Three- 2 kg, Plate Four- 2.4 kg, Plate Five-2.6 kg, Plate Six- 2.6 kg.
  7. Note down the time when the batch was loaded.
  8. From south and north take samples.
fig1. LOD Data
fig2. Batch Loading

Conclusion:

Batch dried in 72 hours.

Next Plan:

See why the dome dryer takes too much time to dry and reduce batch drying time.

Leave a comment