Objective:
It’s the second trial on a colored dome dryer. The objective was to improve the efficiency of colored dome dryer to dry substrate in minimum time.
Procedure:
This batch was loaded at 6 pm on 28th JAN’19. The procedure followed was as follows;
- Take 3.5 kg sawdust.
- Mix 11 liter water in sawdust.
- Leave the mixture for half an hour.
- After that do the weight of it.
- Take 10 gm sample for LOD.
- distribute wet sawdust on each plate. As follows, Plate One- 1 kg, Plate Two- 1.5 kg, Plate Three- 2 kg, Plate Four- 2.4 kg, Plate Five-2.6 kg, Plate Six- 2.6 kg.
- Note down the time when the batch was loaded.
- From south and north take samples.


Conclusion:
The sawdust was dried in 36 hours. It took minimum time to dry as compared to the first colored dome dryer trial.
Next Plan:
We are making 3 dome dryers and next trials will be taken on one of them.